BOA Completed Drydocking of Q4000

23.06.2023

We are happy to share that BOA has successfully completed the drydocking of the well intervention semi-submersible vessel, Q4000, in the Gulf of Mexico.

Due to the vessels footprint, BOA provided our industry leading dual barge solution. The operation was performed with our Boa Barge 29 & Boa Barge 30 including our in-house engineering and design for link beams, cribbing and guideposts. BOA operated the barges in sync and oversaw the float-on/float-off operation in accordance with our procedures and manuals.

BOA would like to thank Helix Energy Solutions Group for the award of the contract and for excellent collaboration.